Question 1. Uran is a gas based power project in_________.

(A) Tamil Nadu

(B) Maharashtra

(C) Karnataka

(D) Gujarat

View Answer
(B) Maharashtra

Question 2. The largest source of energy in India is________.

(A) Hydro-electricity

(B) Coal

(C) Petroleum

(D) Nuclear

View Answer
(B) Coal

Question 3. The highest share in power generation in India is of________.

(A) Atomic power

(B) Thermal power

(C) Hydro power

(D) All above have equal shares

View Answer
(B) Thermal power

Question 4. The correct sequence of energy sources in order of their share in power sector in India is_________.

(A) Nuclear > Hydro > Wind > Thermal

(B) Hydro > Nuclear > Thermal > Wind

(C) Thermal > Nuclear > Hydro > Wind

(D) Thermal > Hydro > Wind > Nuclear

View Answer
(B) Hydro > Nuclear > Thermal > Wind

Question 5. The super thermal electricity plant established by National Thermal Power Corporation (NTPC) in West Bengal is situated at _________.

(A) Farakka

(B) Chandranagar

(C) Bairakpur

(D) Asansol

View Answer
(A) Farakka

Question 6. The Neyveli thermal power plant is fed by________.

(A) Cambrian coal

(B) Quaternary coal

(C) Tertiary coal

(D) Gondwana coal

View Answer
(C) Tertiary coal

Question 7. Ramagundam Super Thermal Power Station is located in________.

(A) Karnataka

(B) Madhya Pradesh

(C) Jharkhand

(D) Andhra Pradesh

View Answer
(D) Andhra Pradesh

Question 8. With the help of which of the following countries, Thermal Power Centre at Obra was established?

(A) Russia

(B) Japan

(C) Germany

(D) America

View Answer
(A) Russia

Question 9. Which one of the following pairs is not correctly matched?

(A) Paras – Andhra Pradesh

(B) Utaran – Gujarat

(C) Harduaganj – Uttar Pradesh

(D) Badarpur – Delhi

View Answer
(A) Paras – Andhra Pradesh

Question 10. Average All-India Thermal Plant Load Factor (PLF) in recent years has been varying between________.

(A) 80-85 %

(B) 70-75 %

(C) 65-70 %

(D) 60-65 %

View Answer
(D) 60-65 % 

Question 11. The thermal power plant of Bokaro is located in_______.

(A) Odisha

(B) Jharkhand

(C) Chhattisgarh

(D) Bihar

View Answer
(B) Jharkhand 

Question 12. Which one of the following pairs is correctly matched? 

(A) Kayamkulom Power Plant – National Thermal Power Corporation

(B) Nabinagar Power Plant – Indian Railways

(C) Power Plant at Jamnagar – Essar Power

(D) Integrated Steel Plant at Jajpur (Odisha) – Steel Authority of India

View Answer
(D) Integrated Steel Plant at Jajpur (Odisha) – Steel Authority of India

Question 13. The share of nuclear energy generated in India in the total energy generated approximately is_________.

(A) 4-5%

(B) 3-4%

(C) 2-3%

(D) 1-2%

View Answer
(C) 2-3%

Question 14. India is self-sufficient in the supply of________.

(A) Plutonium

(B) Iridium

(C) Thorium

(D) Uranium

View Answer
(C) Thorium

Question 15. In which place was the first Nuclear Power Station established in India?

(A) Narora

(B) Tarapur

(C) Kota

(D) Kalpakkam

View Answer
(B) Tarapur 

Question 16. The share of nuclear energy generated in India in the total energy generated was_________.

(A) Between 6 and 8 percent

(B) Between 4 and 6 percent

(C) Between 3 and 4 percent

(D) Between 2 and 3 percent

View Answer
(D) Between 2 and 3 percent

Question 17. Which one of the following pairs is not correctly matched?

Nuclear Year of Plant Commissioning

(A) Kalpakkam – 1984

(B) Kaiga – 1999

(C) Kakrapara – 1993

(D) Kota – 1973

View Answer
(B) Kaiga – 1999

Question 18. Which one of the following is not correctly matched?

(A) Ennore – Meghalaya

(B) Muppandal – Tamil Nadu

(C) Rawatbhata – Rajasthan

(D) Kaiga – Karnataka

View Answer
(A) Ennore – Meghalaya

Question 19. Russia has agreed to install how many units of nuclear reactors in Kudankulam Nuclear Power Plant?

(A) 6

(B) 5

(C) 4

(D) 2

View Answer
(A) 6

Question 20. Kudankulam Nuclear Power Plant is established in_______.

(A) Karnataka

(B) Andhra Pradesh

(C) Kerala

(D) Tamil Nadu

View Answer
(D) Tamil Nadu

Question 21. India is constructing its 25th Nuclear Plant at_______.

(A) Rawatbhata (Rajasthan)

(B) Kakrapar (Rajasthan)

(C) Fatehabad (Haryana)

(D) Bargi (Madhya Pradesh)

View Answer
(A) Rawatbhata (Rajasthan)

Question 22. The twentieth nuclear power station of India is_______.

(A) Narora (Uttar Pradesh)

(B) Kaiga (Karnataka)

(C) Rawatbhata

(D) Tarapur

View Answer
(B) Kaiga (Karnataka)

Question 23. Which of the following places does not have Heavy-water plant for atomic energy?

(A) Tuticorin

(B) Thal

(C) Hazira

(D) Kalpakkam

View Answer
(D) Kalpakkam

Question 24.‘Mithivirdi’ Nuclear Power Plant is set up in collaboration with which of the following countries?

(A) France

(B) Russia

(C) Canada

(D) USA

View Answer
(D) USA 

Question 25. Anushakti Vidyut Nigam Limited is a joint venture of the Nuclear Power Corporation of India and________.

(A) NTPC

(B) BHEL

(C) NHPC

(D) NMDC

View Answer
(B) BHEL 